The Tidewater Pioneer Spread C Scope includes the installation of approximately 11 km of 508 mm (NPS 20), associated facilities, as well NPS 30 piping to tie-in at the Sundance Facility.

The pipeline will be owned and operated by Tidewater Midstream Infrastructure Ltd. (Tidewater) This lateral portion of the project is the last segment to connect their Brazeau River Complex to the TransAlta Sundance Power Generating Facility.